






from top to bottom
1. Laundry (maynot look impressive but there was a method behind my changes, space for wm and alfresco drinks fridge)
2+3. Kitchen (need to chat about rhs overhead cabinets, not quite lined up with bulkhead unsure if that's plaster problem or cabinet problem)
4. Powder room - this room gets no natural sunlight and you can tell the difference but quite happy with how this looks)
5+6. Master ensuite, with close up view of the bench, Vulcan stone (colour name) laminate benches and powder white cabinets throughout house except kitchen which will have essastone in French black.
7. Kids bathroom.
other bits and pieces coming along slowly, still waiting for hebel to be fixed out front before house render can be finished