Saturday 30 November 2013

Cabinetry

lots of Pics


from top to bottom
1. Laundry (maynot look impressive but there was a method behind my changes, space for wm and alfresco drinks fridge)
2+3. Kitchen (need to chat about rhs overhead cabinets, not quite lined up with bulkhead unsure if that's plaster problem or cabinet problem)
4. Powder room - this room gets no natural sunlight and you can tell the difference but quite happy with how this looks)
5+6. Master ensuite, with close up view of the bench, Vulcan stone (colour name) laminate benches and powder white cabinets throughout house except kitchen which will have essastone in French black.
7. Kids bathroom.

other bits and pieces coming along slowly, still waiting for hebel to be fixed out front before house render can be finished

Tuesday 19 November 2013

Stairs



have been too busy to really take proper pics at site sorry, but this is the staircase cant believe how light the house is, was overcast today and those windows face south...the stairs will be painted magnesium like the rest of the trim in the house...and carpeted for the kids safety...not flash but functional

Wednesday 13 November 2013

Security, Plaster and Stairs

Security system is up onsite following some unsavoury cup day antics of local teens :(

Stairs are in but couldn't get a good pic, but happy to be locked out as it means so is everyone else!



Cornice is up - unsure if upstairs has been fully repaired but void platform is down so I believe 2 of the windows have had their arketraves installed too.
Below is kitchen and office boths pics taken from outside still


and here is blind colour I think we will go with...boring blinds but double rollers on front of house so we can let light in and have privacy still, and panels for sliding door


base coat of render has been finished apart from garage and front wall which still needs hebel looked at due to window issue...

Sunday 3 November 2013

Plasterboard and bits

only a couple of pics - Friend of ours in kitchen, master bed and the roof trusses of garage up